01
October

Large project in Moscow
Soundcafe was working on a major project in September.
The private event turned out to be large-scale and bright.
- 3 weeks of assembly work
- More than 200 technical personnel involved in the installation and configuration of equipment
- More than 1000 lighting devices
- 350 m2 screens
- Kinetic systems allowing to change the space of the hall
- Music, light and pyrotechnic show on the water
- Total power consumption 2 MW
- 4000 square meters of building